Uncovering the Eaves

Work began in earnest on Monday on the re-roofing project.  A four-foot-wide strip of metal roofing was cut back and the sheathing boards removed all along the original North eave of the house.    To create a strong and even bearing surface for the new roof, blocking was added between each rafter, and then new tongue and groove sheathing boards were nailed vertically across the entire eave.  The new work was then temporarily covered with tar paper until the new EPDM roofing is installed.

 

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s